Apr 22
Bids in
11 days
19128 GTRA ARFF Road Full Depth Reclamation (FDR) #17923
(T-NR-E) Work will be that associated with the ARFF Access Road Reconstruction (FDR) project which will involve full depth reclamation of the ARFF access road, concrete flume replacement, storm drainage ditch rehabilitation including regrading, storm pipe replacement, and associated pavement patching.
Plan Holders
Date | Company | Contact | Bid Categories |
4/1/25 1:23 pm | Construct Connect
3825 Edwards Rd Suite 800 Cincinatti, OH 45209 | Rye Jumuad Planroom Tel: 323-602-5079 Fax: 866-570-8187 | Plan Room |
3/24/25 8:58 am | Neel-Schaffer | Birmingham
2 Perimeter Park South Suite 230 E Birmingham, AL 35243 | Joshua Stump Project manager Tel: 205-912-8549 Fax: 205-397-3900 | |
3/24/25 8:58 am | PH Bidding Group
605 W. Main St. Tupelo, MS 38804 | Stephen Tutor Plan Room Administrator Tel: 662-407-0193 | |
4/2/25 5:08 pm | PHILLIPS CONTRACTING CO., INC.
PO Box 7530 Columbus, MS 39705 | Tyler Shepherd Tel: 662-574-2926 Fax: 662-329-3291 | General Contractor |
3/24/25 8:58 am | Statewide Plan Room
605 West Main Street Tupelo, MS 38804 | Statewide Plan Room Tel: 662-407-0193 |